A building with 2 dwellings (2 storeys), built around 1890, on a 372 m² lot. 4 building permits since 1990. Listed in the inventory of heritage buildings built before 1940. Older than 86% of the buildings on 35e Avenue. Assessed lower than 67% of the houses and plexes on 35e Avenue.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years2
Demolition permits within 300 m, 2 years1
In Lachine, the borough issued 64 construction permits and 19 demolition permits in the last two years. About the borough
Street and trees
City trees in front2 · Crab Apple
BoroughLachine
Questions about 285 35e Avenue
What is 285 35e Avenue assessed at?
$743,400 on the 2026-2027-2028 assessment roll. The previous roll had it at $657,900. More
How much is the welcome tax for 285 35e Avenue?
About $10,217 on its assessed value of $743,400. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 285 35e Avenue built?
Around 1890, according to the assessment roll (estimated year).
How many dwellings does 285 35e Avenue have?
2 dwellings, according to the assessment roll.
Is 285 35e Avenue in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 285 35e Avenue have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 285 35e Avenue a heritage building?
It is in the City’s inventory of buildings built before 1940. It is not protected, but some work may need a review. More
Can 285 35e Avenue be rented short term (Airbnb)?
No. The City of Montréal does not allow short-term rentals to tourists in this borough, even in a principal residence. More
What building permits has 285 35e Avenue had?
The City has issued 4 permits since 1990. The latest, from Jun 2026: transformation. More
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.