A single-family home (2 storeys), built in 1927, on a 241 m² lot. 2 building permits since 1990. Listed in the inventory of heritage buildings built before 1940. Guy-Concordia metro station is 340 m away. Assessed higher than 63% of the houses and plexes on rue Redpath-Row.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years0
Demolition permits within 300 m, 2 years0
In Ville-Marie, the borough issued 39 construction permits and 25 demolition permits in the last two years. About the borough
Street and trees
City trees in front1 · Littleleaf European Linden
BoroughVille-Marie
Questions about 3 rue Redpath-Row
What is 3 rue Redpath-Row assessed at?
$1,986,800 on the 2026-2027-2028 assessment roll. The previous roll had it at $1,892,200. More
How much is the welcome tax for 3 rue Redpath-Row?
About $39,496 on its assessed value of $1,986,800. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 3 rue Redpath-Row built?
In 1927, according to the assessment roll.
How many dwellings does 3 rue Redpath-Row have?
1 dwelling, according to the assessment roll.
Is 3 rue Redpath-Row in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 3 rue Redpath-Row have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 3 rue Redpath-Row a heritage building?
It is in the City’s inventory of buildings built before 1940. It is not protected, but some work may need a review. More
Can 3 rue Redpath-Row be rented short term (Airbnb)?
Only as the owner’s or tenant’s principal residence, from June 10 to September 10, 31 days at most, with a yearly City permit and a CITQ registration number. More
What building permits has 3 rue Redpath-Row had?
The City has issued 2 permits since 1990. The latest, from Oct 2026: travaux intérieurs. More
How far is the nearest metro station from 3 rue Redpath-Row?
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.