A single-family home (2 storeys), built in 1984, on a 460 m² lot. 1 building permit since 1990. Du Collège metro station is 1.8 km away. Assessed lower than 89% of the houses and plexes on carré Satim.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years0
Demolition permits within 300 m, 2 years0
In Saint-Laurent, the borough issued 22 construction permits and 1 demolition permit in the last two years. About the borough
Street and trees
City trees in frontNone recorded
BoroughSaint-Laurent
Questions about 640 carré Satim
What is 640 carré Satim assessed at?
$1,193,300 on the 2026-2027-2028 assessment roll. The previous roll had it at $1,084,800. More
How much is the welcome tax for 640 carré Satim?
About $19,658 on its assessed value of $1,193,300. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 640 carré Satim built?
In 1984, according to the assessment roll.
How many dwellings does 640 carré Satim have?
1 dwelling, according to the assessment roll.
Is 640 carré Satim in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 640 carré Satim have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 640 carré Satim a heritage building?
No. It is not listed or protected as heritage by the City. More
Can 640 carré Satim be rented short term (Airbnb)?
No. The City of Montréal does not allow short-term rentals to tourists in this borough, even in a principal residence. More
What building permits has 640 carré Satim had?
The City has issued 1 permit since 1990. The latest, from Aug 1993: ag agrandissement int / ext. More
How far is the nearest metro station from 640 carré Satim?
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.