A single-family home (2 storeys), built in 2002, on a 813 m² lot. 6 building permits since 1990. Assessed higher than 82% of the houses and plexes on rue Rose.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years10
Demolition permits within 300 m, 2 years0
In Pierrefonds-Roxboro, the borough issued 682 construction permits and 20 demolition permits in the last two years. About the borough
Street and trees
City trees in front14 · Eastern White Cedar, Eastern Cottonwood
BoroughPierrefonds-Roxboro
Questions about 87 rue Rose
What is 87 rue Rose assessed at?
$1,940,300 on the 2026-2027-2028 assessment roll. The previous roll had it at $1,687,200. More
How much is the welcome tax for 87 rue Rose?
About $38,333 on its assessed value of $1,940,300. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 87 rue Rose built?
In 2002, according to the assessment roll.
How many dwellings does 87 rue Rose have?
1 dwelling, according to the assessment roll.
Is 87 rue Rose in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 87 rue Rose have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 87 rue Rose a heritage building?
No. It is not listed or protected as heritage by the City. More
Can 87 rue Rose be rented short term (Airbnb)?
Only as the owner’s or tenant’s principal residence, from June 10 to September 10, 31 days at most, with a yearly City permit and a CITQ registration number. More
What building permits has 87 rue Rose had?
The City has issued 6 permits since 1990. The latest, from Apr 2003: ea- equipement accessoire. More
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.