A single-family home (2 storeys), built in 1936, on a 1,944 m² lot. 2 building permits since 1990. Listed in the inventory of heritage buildings built before 1940. Édouard-Montpetit metro station is 820 m away. Assessed higher than 98% of the houses and plexes on avenue Maplewood.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years0
Demolition permits within 300 m, 2 years0
In Outremont, the borough issued 3 construction permits and 0 demolition permits in the last two years. About the borough
Street and trees
City trees in frontNone recorded
BoroughOutremont
Questions about 153 avenue Maplewood
What is 153 avenue Maplewood assessed at?
$6,440,800 on the 2026-2027-2028 assessment roll. The previous roll had it at $5,855,300. More
How much is the welcome tax for 153 avenue Maplewood?
About $210,528 on its assessed value of $6,440,800. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 153 avenue Maplewood built?
In 1936, according to the assessment roll.
How many dwellings does 153 avenue Maplewood have?
1 dwelling, according to the assessment roll.
Is 153 avenue Maplewood in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 153 avenue Maplewood have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 153 avenue Maplewood a heritage building?
It is in the City’s inventory of buildings built before 1940. It is not protected, but some work may need a review. More
Can 153 avenue Maplewood be rented short term (Airbnb)?
Only as the owner’s or tenant’s principal residence, from June 10 to September 10, 31 days at most, with a yearly City permit and a CITQ registration number. More
What building permits has 153 avenue Maplewood had?
The City has issued 2 permits since 1990. The latest, from Apr 2019: transformation. More
How far is the nearest metro station from 153 avenue Maplewood?
Édouard-Montpetit is 820 m away in a straight line.
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.