From $8,722,100 on the roll in force in 2022 to $12,555,000 on the current roll: +44%.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
The building
UseParking garage
Storeys4
Lot area7,779 m²
Land use in the urban planemplois
Built area on the lot (City outlines, 2016)≈ 4,647 m²
City plan for the pipes under the street (2023–2027)Water main: no work needed · sewer: to be studied
Water main breaks repaired within 35 m (1972–2017)None recorded
Metro and bus near 300 rue Oak
Nearest metro: Bonaventure (Orange line)1.5 km
Bridge / Mill · 74232 m
Bridge / Mill · 74257 m
Bridge / Wellington · 74297 m
To downtown (McGill station) by metro and bus, weekday morning≈ 28 min
Public schools near 300 rue Oak
French-language public elementary schoolÉcole Charles-Lemoyne, 1.1 km
English-language public elementary schoolÉcole Saint-Gabriel, 1.4 km
French-language public secondary schoolÉcole Monseigneur-Richard, 2.2 km
English-language public secondary schoolÉcole secondaire Vézina, 1.4 km
The nearest school of each kind in a straight line, not the school of the address: each school service centre (French) and school board (English) sets its own territories, so ask it. English public schools require a certificate of eligibility under the Charter of the French language. Source: Ministère de l’Éducation du Québec.
Building activity nearby
Construction permits within 300 m, 2 years0
Demolition permits within 300 m, 2 years0
In Le Sud-Ouest, the borough issued 52 construction permits and 28 demolition permits in the last two years. About the borough
Life around 300 rue Oak
City 311 requests within 150 m, last 12 months8 · streets, sidewalks and lights 5, water and sewers 3
Ground-floor shops within 500 m12 · grocery and daily shops 1, other shops 2, services 8, bars, entertainment and hotels 1
Empty storefronts within 500 m8%
Nearest food shopCostco essence, 330 m
Playground760 m
Dog run510 m
Public poolCentre sportif Petite-Bourgogne, 1.2 km
Wading pool or splash padJeux d'eau Saint-Jacques, 1.2 km
Outdoor skating rink1.3 km
LibraryBibliothèque de Saint-Charles, 1.4 km
Ville de Montréal open data: 311 requests are counted around the address, never tied to one home; shops come from the City’s survey of ground-floor commercial premises; distances are in a straight line.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Questions about 300 rue Oak
What is 300 rue Oak assessed at?
$12,555,000 on the 2026-2027-2028 assessment roll. The previous roll had it at $11,016,000. More
How much is the welcome tax for 300 rue Oak?
About $455,096 on its assessed value of $12,555,000. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
How has the assessed value of 300 rue Oak changed?
From $8,722,100 on the roll in force in 2022 to $12,555,000 on the current roll: +44%. The previous roll had it at $11,016,000. More
Is 300 rue Oak in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 300 rue Oak have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 300 rue Oak a heritage building?
No. It is not listed or protected as heritage by the City. More
Can 300 rue Oak be rented short term (Airbnb)?
Only as the owner’s or tenant’s principal residence, from June 10 to September 10, 31 days at most, with a yearly City permit and a CITQ registration number. More
What building permits has 300 rue Oak had?
The City has issued 2 permits since 1990. The latest, from Sep 2000: construction. More
How far is the nearest metro station from 300 rue Oak?
Bonaventure is 1.5 km away in a straight line.
How long does it take to get downtown from 300 rue Oak?
About 28 minutes by metro and bus on a weekday morning to McGill station, with the walk to the stop, according to the STM timetable.
Checked against Montréal open data and the Quebec assessment roll on October 29, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.