A building with 2 dwellings (2 storeys), built in 1951, on a 348 m² lot. 1 building permit since 1990. Viau metro station is 1.2 km away. Newer than 63% of the buildings on 5e Avenue. Assessed higher than 92% of the houses and plexes on 5e Avenue.
Welcome tax estimated with the City of Montréal’s 2026 brackets on the assessed value; the notary calculates it on the higher of the price and the adjusted value.
In the full report: incidents reported to the SPVM within 300 m over the last 12 months, by type.
Break-ins
Theft from vehicles
Vehicle theft
Mischief
Robbery
Building activity nearby
Construction permits within 300 m, 2 years0
Demolition permits within 300 m, 2 years0
In Lachine, the borough issued 64 construction permits and 19 demolition permits in the last two years. About the borough
Street and trees
City trees in frontNone recorded
BoroughLachine
Questions about 780-782 5e Avenue
What is 780-782 5e Avenue assessed at?
$1,054,700 on the 2026-2027-2028 assessment roll. The previous roll had it at $900,500. More
How much is the welcome tax for 780-782 5e Avenue?
About $16,443 on its assessed value of $1,054,700. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 780-782 5e Avenue built?
In 1951, according to the assessment roll.
How many dwellings does 780-782 5e Avenue have?
2 dwellings, according to the assessment roll.
Is 780-782 5e Avenue in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Does 780-782 5e Avenue have a notice of deterioration?
No. The Ville de Montréal has registered no notice of deterioration on this building. More
Is 780-782 5e Avenue a heritage building?
No. It is not listed or protected as heritage by the City. More
Can 780-782 5e Avenue be rented short term (Airbnb)?
No. The City of Montréal does not allow short-term rentals to tourists in this borough, even in a principal residence. More
What building permits has 780-782 5e Avenue had?
The City has issued 1 permit since 1990. The latest, from Mar 2001: construction. More
How far is the nearest metro station from 780-782 5e Avenue?
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.