Unit 2 of 4 on the roll at 136 rue Tower. Number 4 by value in the building. Assessed value +5% since the previous roll. A condo building with 4 units on the assessment roll, built in 2004.
One-time payment, no subscription · PDF for your broker and notary · Secure payment with Stripe
Street view
Google Street View, loads when you click
What the records show for 2-136 rue Tower
Note
Condo building, 4 units on the roll
Free preview
What the record says
4 divided co-ownership units at this address, built 2004.
What it means
Since the 2020 reform of co-ownership rules, the syndicate must have a contingency fund study and a maintenance log. Older buildings often face special assessments.
What to do
Ask for the syndicate’s certificate on the state of the co-ownership, the contingency fund study, the maintenance log, two years of minutes and the declaration of co-ownership.
The full report explains every finding like this one.
Check
Rainwater can pool on this lot in a heavy storm
What it means and what to ask
What the record says
What it means
What to do
What the record says, what it means for a buyer and what to ask the seller and the notary: for this finding and every other one, in the full report.
Welcome tax estimated with the provincial 2026 brackets on the assessed value; Beaconsfield may set a higher rate above $500,000, so confirm with your notary.
$774,600 on the 2026-2027-2028 assessment roll. More
How much is the welcome tax for 2-136 rue Tower?
About $9,730 on its assessed value of $774,600. The tax is calculated on the highest of the price paid, the value in the deed and the adjusted assessed value, so the real amount may be higher. More
When was 2-136 rue Tower built?
In 2004, according to the assessment roll.
Is 2-136 rue Tower in a flood zone?
No. It is not in a flood zone mapped by the Quebec government. More
Beaconsfield is a separate municipality of the Montréal agglomeration: the Ville de Montréal’s permits, notices, right of first refusal and heritage files do not cover it. Ask the city of Beaconsfield for them.
Checked against Montréal open data and the Quebec assessment roll on October 25, 2026. Lot outlines come from the City’s assessment units and have no legal value; the certificate of location decides.