8221 boulevard Pie-IX vs 8888 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
8221 boulevard Pie-IX is the older building (1955); 8888 boulevard Pie-IX was built in 1988. 8888 boulevard Pie-IX is assessed at $30,090,200, 1474% more than 8221 boulevard Pie-IX ($1,912,100). 8221 boulevard Pie-IX has 5 building permits on record, 8888 boulevard Pie-IX has 7. Neither is in a flood zone.
| 8221 boulevard Pie-IX | 8888 boulevard Pie-IX | |
|---|---|---|
| Type | 12 dwellings | House or building |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1955 | 1988 |
| Assessed (roll) | $1,912,100 | $30,090,200 |
| Since the previous roll | +24 % | +35 % |
| Welcome tax on that value | ≈ $37,628 | ≈ $1,156,504 |
| Lot | 842 m² | 24,711 m² |
| Floor area | 978 m² | 35,544 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 5 · Mar 2009 | 7 · May 2008 |
| Findings | 4 Note | 5 Note |
| Nearest metro | Saint-Michel, 1.5 km | Saint-Michel, 2.3 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 8221 boulevard Pie-IX Full report: 8888 boulevard Pie-IX