8000 boulevard Pie-IX vs 8665 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
8665 boulevard Pie-IX is the older building (1965); 8000 boulevard Pie-IX was built in 1973. 8665 boulevard Pie-IX is assessed at $3,994,800, 212% more than 8000 boulevard Pie-IX ($1,280,400). 8000 boulevard Pie-IX has 1 building permits on record, 8665 boulevard Pie-IX has 3. Neither is in a flood zone.
| 8000 boulevard Pie-IX | 8665 boulevard Pie-IX | |
|---|---|---|
| Type | House or building | 24 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1973 | 1965 |
| Assessed (roll) | $1,280,400 | $3,994,800 |
| Since the previous roll | +14 % | +24 % |
| Welcome tax on that value | ≈ $21,836 | ≈ $112,688 |
| Lot | 799 m² | 1,192 m² |
| Floor area | 505 m² | 1,979 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 1 · Oct 2019 | 3 · Nov 2018 |
| Findings | 5 Note | 4 Note |
| Nearest metro | Saint-Michel, 1.3 km | Saint-Michel, 2.1 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 8000 boulevard Pie-IX Full report: 8665 boulevard Pie-IX