7504-7514 boulevard Pie-IX vs 8511 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7504-7514 boulevard Pie-IX is the older building (1952); 8511 boulevard Pie-IX was built in 1956. 7504-7514 boulevard Pie-IX is assessed at $870,700, 3% more than 8511 boulevard Pie-IX ($846,700). 7504-7514 boulevard Pie-IX has 1 building permits on record, 8511 boulevard Pie-IX has 2. Neither is in a flood zone.

7504-7514 boulevard Pie-IX8511 boulevard Pie-IX
Type6 dwellings8 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19521956
Assessed (roll)$870,700$846,700
Since the previous roll+3 %+12 %
Welcome tax on that value≈ $12,763≈ $12,283
Lot499 m²375 m²
Floor area305 m²474 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record1 · Apr 20092 · Dec 2025
Findings 5 Note1 Serious 1 Check 4 Note
Nearest metroSaint-Michel, 1.0 kmSaint-Michel, 1.9 km

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7504-7514 boulevard Pie-IX Full report: 8511 boulevard Pie-IX

Compare other addresses