7265-7269 boulevard Pie-IX vs 8261 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7265-7269 boulevard Pie-IX is the older building (1952); 8261 boulevard Pie-IX was built in 1955. 8261 boulevard Pie-IX is assessed at $2,093,100, 176% more than 7265-7269 boulevard Pie-IX ($758,000). 7265-7269 boulevard Pie-IX has 1 building permits on record, 8261 boulevard Pie-IX has 0. Neither is in a flood zone.
| 7265-7269 boulevard Pie-IX | 8261 boulevard Pie-IX | |
|---|---|---|
| Type | 3 dwellings | 12 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1952 | 1955 |
| Assessed (roll) | $758,000 | $2,093,100 |
| Since the previous roll | +25 % | +24 % |
| Welcome tax on that value | ≈ $10,509 | ≈ $42,153 |
| Lot | 375 m² | 880 m² |
| Floor area | 204 m² | 978 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 1 · Jun 2022 | 0 |
| Findings | 1 Check 4 Note | 5 Note |
| Nearest metro | Saint-Michel, 1.0 km | Saint-Michel, 1.5 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7265-7269 boulevard Pie-IX Full report: 8261 boulevard Pie-IX