8000 boulevard Pie-IX vs 8971 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
8971 boulevard Pie-IX is the older building (1957); 8000 boulevard Pie-IX was built in 1973. 8000 boulevard Pie-IX is assessed at $1,280,400, 11% more than 8971 boulevard Pie-IX ($1,153,700). 8000 boulevard Pie-IX has 1 building permits on record, 8971 boulevard Pie-IX has 2. Neither is in a flood zone.
| 8000 boulevard Pie-IX | 8971 boulevard Pie-IX | |
|---|---|---|
| Type | House or building | 8 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1973 | 1957 |
| Assessed (roll) | $1,280,400 | $1,153,700 |
| Since the previous roll | +14 % | +12 % |
| Welcome tax on that value | ≈ $21,836 | ≈ $18,668 |
| Lot | 799 m² | 405 m² |
| Floor area | 505 m² | 474 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 1 · Oct 2019 | 2 · Sep 2015 |
| Findings | 5 Note | 4 Note |
| Nearest metro | Saint-Michel, 1.3 km | Saint-Michel, 2.5 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 8000 boulevard Pie-IX Full report: 8971 boulevard Pie-IX