7670 boulevard Pie-IX vs 9377 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7670 boulevard Pie-IX is the older building (1953); 9377 boulevard Pie-IX was built in 1957. 9377 boulevard Pie-IX is assessed at $1,239,100, 25% more than 7670 boulevard Pie-IX ($990,900). 7670 boulevard Pie-IX has 2 building permits on record, 9377 boulevard Pie-IX has 1. Neither is in a flood zone.

7670 boulevard Pie-IX9377 boulevard Pie-IX
Type5 dwellings8 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19531957
Assessed (roll)$990,900$1,239,100
Since the previous roll+19 %+12 %
Welcome tax on that value≈ $15,167≈ $20,803
Lot515 m²297 m²
Floor area332 m²450 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record2 · Dec 20121 · Dec 1998
Findings 1 Check 5 Note 6 Note
Nearest metroSaint-Michel, 1.1 km—

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7670 boulevard Pie-IX Full report: 9377 boulevard Pie-IX

Compare other addresses