7670 boulevard Pie-IX vs 9377 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7670 boulevard Pie-IX is the older building (1953); 9377 boulevard Pie-IX was built in 1957. 9377 boulevard Pie-IX is assessed at $1,239,100, 25% more than 7670 boulevard Pie-IX ($990,900). 7670 boulevard Pie-IX has 2 building permits on record, 9377 boulevard Pie-IX has 1. Neither is in a flood zone.
| 7670 boulevard Pie-IX | 9377 boulevard Pie-IX | |
|---|---|---|
| Type | 5 dwellings | 8 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1953 | 1957 |
| Assessed (roll) | $990,900 | $1,239,100 |
| Since the previous roll | +19 % | +12 % |
| Welcome tax on that value | ≈ $15,167 | ≈ $20,803 |
| Lot | 515 m² | 297 m² |
| Floor area | 332 m² | 450 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 2 · Dec 2012 | 1 · Dec 1998 |
| Findings | 1 Check 5 Note | 6 Note |
| Nearest metro | Saint-Michel, 1.1 km | — |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7670 boulevard Pie-IX Full report: 9377 boulevard Pie-IX