7361 boulevard Pie-IX vs 8971 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7361 boulevard Pie-IX is the older building (1951); 8971 boulevard Pie-IX was built in 1957. 8971 boulevard Pie-IX is assessed at $1,153,700, 56% more than 7361 boulevard Pie-IX ($738,800). 7361 boulevard Pie-IX has 3 building permits on record, 8971 boulevard Pie-IX has 2. Neither is in a flood zone.

7361 boulevard Pie-IX8971 boulevard Pie-IX
Type6 dwellings8 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19511957
Assessed (roll)$738,800$1,153,700
Since the previous roll+3 %+12 %
Welcome tax on that value≈ $10,125≈ $18,668
Lot386 m²405 m²
Floor area367 m²474 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record3 · Oct 20232 · Sep 2015
Findings 4 Note 4 Note
Nearest metroSaint-Michel, 1.0 kmSaint-Michel, 2.5 km

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7361 boulevard Pie-IX Full report: 8971 boulevard Pie-IX

Compare other addresses