7350 boulevard Pie-IX vs 9477 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7350 boulevard Pie-IX is the older building (1950); 9477 boulevard Pie-IX was built in 2025. 9477 boulevard Pie-IX is assessed at $5,957,300, 614% more than 7350 boulevard Pie-IX ($834,900). 7350 boulevard Pie-IX has 0 building permits on record, 9477 boulevard Pie-IX has 3. Neither is in a flood zone.

7350 boulevard Pie-IX9477 boulevard Pie-IX
Type4 dwellings27 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19502025
Assessed (roll)$834,900$5,957,300
Since the previous roll+19 %+2 %
Welcome tax on that value≈ $12,047≈ $191,188
Lot284 m²1,320 m²
Floor area222 m²2,170 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record03 · Jul 2023
Findings 1 Check 4 Note 6 Note
Nearest metroSaint-Michel, 980 m—

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7350 boulevard Pie-IX Full report: 9477 boulevard Pie-IX

Compare other addresses