7340 boulevard Pie-IX vs 8291 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7340 boulevard Pie-IX is the older building (1950); 8291 boulevard Pie-IX was built in 1955. 8291 boulevard Pie-IX is assessed at $2,257,300, 165% more than 7340 boulevard Pie-IX ($850,600). 7340 boulevard Pie-IX has 0 building permits on record, 8291 boulevard Pie-IX has 1. Neither is in a flood zone.
| 7340 boulevard Pie-IX | 8291 boulevard Pie-IX | |
|---|---|---|
| Type | 4 dwellings | 12 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1950 | 1955 |
| Assessed (roll) | $850,600 | $2,257,300 |
| Since the previous roll | +19 % | +24 % |
| Welcome tax on that value | ≈ $12,361 | ≈ $47,466 |
| Lot | 386 m² | 812 m² |
| Floor area | 222 m² | 978 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 0 | 1 · Aug 1996 |
| Findings | 4 Note | 5 Note |
| Nearest metro | Saint-Michel, 980 m | Saint-Michel, 1.6 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7340 boulevard Pie-IX Full report: 8291 boulevard Pie-IX