7259-7261 boulevard Pie-IX vs 8665 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7259-7261 boulevard Pie-IX is the older building (1952); 8665 boulevard Pie-IX was built in 1965. 8665 boulevard Pie-IX is assessed at $3,994,800, 428% more than 7259-7261 boulevard Pie-IX ($756,400). 7259-7261 boulevard Pie-IX has 0 building permits on record, 8665 boulevard Pie-IX has 3. Neither is in a flood zone.
| 7259-7261 boulevard Pie-IX | 8665 boulevard Pie-IX | |
|---|---|---|
| Type | 3 dwellings | 24 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1952 | 1965 |
| Assessed (roll) | $756,400 | $3,994,800 |
| Since the previous roll | +25 % | +24 % |
| Welcome tax on that value | ≈ $10,477 | ≈ $112,688 |
| Lot | 388 m² | 1,192 m² |
| Floor area | 204 m² | 1,979 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 0 | 3 · Nov 2018 |
| Findings | 4 Note | 4 Note |
| Nearest metro | Saint-Michel, 1.0 km | Saint-Michel, 2.1 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7259-7261 boulevard Pie-IX Full report: 8665 boulevard Pie-IX