7090-7092 boulevard Pie-IX vs 7245-7247 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7090-7092 boulevard Pie-IX is the older building (1950); 7245-7247 boulevard Pie-IX was built in 1951. 7090-7092 boulevard Pie-IX is assessed at $799,100, 14% more than 7245-7247 boulevard Pie-IX ($699,000). 7090-7092 boulevard Pie-IX has 0 building permits on record, 7245-7247 boulevard Pie-IX has 1. Neither is in a flood zone.
| 7090-7092 boulevard Pie-IX | 7245-7247 boulevard Pie-IX | |
|---|---|---|
| Type | 2 dwellings | 2 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1950 | 1951 |
| Assessed (roll) | $799,100 | $699,000 |
| Since the previous roll | +25 % | +25 % |
| Welcome tax on that value | ≈ $11,331 | ≈ $9,329 |
| Lot | 322 m² | 292 m² |
| Floor area | 189 m² | 195 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 0 | 1 · Oct 2017 |
| Findings | 4 Note | 1 Serious 5 Note |
| Nearest metro | Saint-Michel, 1.0 km | Saint-Michel, 1.0 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7090-7092 boulevard Pie-IX Full report: 7245-7247 boulevard Pie-IX