7190 boulevard Pie-IX vs 8231 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7190 boulevard Pie-IX is the older building (1950); 8231 boulevard Pie-IX was built in 1955. 8231 boulevard Pie-IX is assessed at $1,922,100, 52% more than 7190 boulevard Pie-IX ($1,263,100). 7190 boulevard Pie-IX has 3 building permits on record, 8231 boulevard Pie-IX has 1. Neither is in a flood zone.

7190 boulevard Pie-IX8231 boulevard Pie-IX
TypeHouse or building12 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19501955
Assessed (roll)$1,263,100$1,922,100
Since the previous roll+14 %+24 %
Welcome tax on that value≈ $21,403≈ $37,878
Lot354 m²842 m²
Floor area518 m²978 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record3 · Aug 20191 · Jul 2012
Findings 1 Check 5 Note 4 Note
Nearest metroSaint-Michel, 1,000 mSaint-Michel, 1.5 km

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7190 boulevard Pie-IX Full report: 8231 boulevard Pie-IX

Compare other addresses