7064-7066 boulevard Pie-IX vs 8501 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
7064-7066 boulevard Pie-IX is the older building (1950); 8501 boulevard Pie-IX was built in 1956. 8501 boulevard Pie-IX is assessed at $1,169,700, 49% more than 7064-7066 boulevard Pie-IX ($785,800). 7064-7066 boulevard Pie-IX has 3 building permits on record, 8501 boulevard Pie-IX has 1. Neither is in a flood zone.
| 7064-7066 boulevard Pie-IX | 8501 boulevard Pie-IX | |
|---|---|---|
| Type | House or building | 8 dwellings |
| City and borough | Montréal · Villeray-Saint-Michel-Parc-Extension | Montréal · Villeray-Saint-Michel-Parc-Extension |
| Built | 1950 | 1956 |
| Assessed (roll) | $785,800 | $1,169,700 |
| Since the previous roll | +18 % | +12 % |
| Welcome tax on that value | ≈ $11,065 | ≈ $19,068 |
| Lot | 322 m² | 372 m² |
| Floor area | 208 m² | 474 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 3 · Jan 2018 | 1 · Aug 2010 |
| Findings | 5 Note | 5 Note |
| Nearest metro | Saint-Michel, 1.0 km | Saint-Michel, 1.9 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 7064-7066 boulevard Pie-IX Full report: 8501 boulevard Pie-IX