7060-7062 boulevard Pie-IX vs 8971 boulevard Pie-IX

Data as of November 1, 2026 · updated every week

7060-7062 boulevard Pie-IX is the older building (1950); 8971 boulevard Pie-IX was built in 1957. 8971 boulevard Pie-IX is assessed at $1,153,700, 68% more than 7060-7062 boulevard Pie-IX ($688,300). 7060-7062 boulevard Pie-IX has 0 building permits on record, 8971 boulevard Pie-IX has 2. Neither is in a flood zone.

7060-7062 boulevard Pie-IX8971 boulevard Pie-IX
Type2 dwellings8 dwellings
City and boroughMontréal · Villeray-Saint-Michel-Parc-ExtensionMontréal · Villeray-Saint-Michel-Parc-Extension
Built19501957
Assessed (roll)$688,300$1,153,700
Since the previous roll+25 %+12 %
Welcome tax on that value≈ $9,115≈ $18,668
Lot322 m²405 m²
Floor area189 m²474 m²
Notice of deteriorationNoNo
City’s right of first refusalNoNo
HeritageNoNo
In a flood zoneNoNo
Building permits on record02 · Sep 2015
Findings1 Serious 5 Note 4 Note
Nearest metroSaint-Michel, 1.0 kmSaint-Michel, 2.5 km

The full report for each address explains every finding and shows the full permit and value history.

Full report: 7060-7062 boulevard Pie-IX Full report: 8971 boulevard Pie-IX

Compare other addresses