2192-2200 boulevard Pie-IX vs 542-562 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2192-2200 boulevard Pie-IX is the older building (1925); 542-562 boulevard Pie-IX was built in 1987. 542-562 boulevard Pie-IX is assessed at $1,652,200, 48% more than 2192-2200 boulevard Pie-IX ($1,113,200). 2192-2200 boulevard Pie-IX has 4 building permits on record, 542-562 boulevard Pie-IX has 1. Neither is in a flood zone.
| 2192-2200 boulevard Pie-IX | 542-562 boulevard Pie-IX | |
|---|---|---|
| Type | 5 dwellings | 6 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1925 | 1987 |
| Assessed (roll) | $1,113,200 | $1,652,200 |
| Since the previous roll | +4 % | +6 % |
| Welcome tax on that value | ≈ $17,656 | ≈ $31,131 |
| Lot | 347 m² | 484 m² |
| Floor area | 440 m² | 545 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | Yes | No |
| In a flood zone | No | No |
| Building permits on record | 4 · Aug 2026 | 1 · Sep 2010 |
| Findings | 3 Check 4 Note | 5 Note |
| Nearest metro | Pie-IX, 620 m | Joliette, 1.3 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2192-2200 boulevard Pie-IX Full report: 542-562 boulevard Pie-IX