2691 boulevard Pie-IX vs 570-590 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2691 boulevard Pie-IX is the older building (1934); 570-590 boulevard Pie-IX was built in 1987. 2691 boulevard Pie-IX is assessed at $2,382,200, 36% more than 570-590 boulevard Pie-IX ($1,757,300). 2691 boulevard Pie-IX has 2 building permits on record, 570-590 boulevard Pie-IX has 1. Neither is in a flood zone.
| 2691 boulevard Pie-IX | 570-590 boulevard Pie-IX | |
|---|---|---|
| Type | 11 dwellings | 6 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1934 | 1987 |
| Assessed (roll) | $2,382,200 | $1,757,300 |
| Since the previous roll | +4 % | +6 % |
| Welcome tax on that value | ≈ $51,838 | ≈ $33,758 |
| Lot | 472 m² | 501 m² |
| Floor area | 628 m² | 585 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | Yes | No |
| In a flood zone | No | No |
| Building permits on record | 2 · Jan 1992 | 1 · May 2014 |
| Findings | 1 Check 5 Note | 5 Note |
| Nearest metro | Pie-IX, 50 m | Joliette, 1.3 km |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2691 boulevard Pie-IX Full report: 570-590 boulevard Pie-IX