2296-2300 boulevard Pie-IX vs 2645 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2296-2300 boulevard Pie-IX is the older building (1940); 2645 boulevard Pie-IX was built in 1947. 2645 boulevard Pie-IX is assessed at $2,392,800, 194% more than 2296-2300 boulevard Pie-IX ($813,100). 2296-2300 boulevard Pie-IX has 2 building permits on record, 2645 boulevard Pie-IX has 4. Neither is in a flood zone.
| 2296-2300 boulevard Pie-IX | 2645 boulevard Pie-IX | |
|---|---|---|
| Type | 3 dwellings | 16 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1940 | 1947 |
| Assessed (roll) | $813,100 | $2,392,800 |
| Since the previous roll | +3 % | +17 % |
| Welcome tax on that value | ≈ $11,611 | ≈ $52,209 |
| Lot | 294 m² | 881 m² |
| Floor area | 229 m² | 1,289 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 2 · Mar 2025 | 4 · Jul 2025 |
| Findings | 3 Check 4 Note | 1 Check 4 Note |
| Nearest metro | Pie-IX, 500 m | Pie-IX, 100 m |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2296-2300 boulevard Pie-IX Full report: 2645 boulevard Pie-IX