2630 boulevard Pie-IX vs 2635 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2630 boulevard Pie-IX is the older building (1940); 2635 boulevard Pie-IX was built in 1947. 2635 boulevard Pie-IX is assessed at $3,839,400, 93% more than 2630 boulevard Pie-IX ($1,989,800). 2630 boulevard Pie-IX has 1 building permits on record, 2635 boulevard Pie-IX has 2. Neither is in a flood zone.
| 2630 boulevard Pie-IX | 2635 boulevard Pie-IX | |
|---|---|---|
| Type | 6 dwellings | 18 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1940 | 1947 |
| Assessed (roll) | $1,989,800 | $3,839,400 |
| Since the previous roll | +4 % | +17 % |
| Welcome tax on that value | ≈ $39,571 | ≈ $106,472 |
| Lot | 514 m² | 792 m² |
| Floor area | 690 m² | 1,289 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 1 · Jul 2009 | 2 · Apr 2022 |
| Findings | 6 Note | 5 Note |
| Nearest metro | Pie-IX, 110 m | Pie-IX, 120 m |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2630 boulevard Pie-IX Full report: 2635 boulevard Pie-IX