2302-2306 boulevard Pie-IX vs 2580 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2580 boulevard Pie-IX is the older building (1930); 2302-2306 boulevard Pie-IX was built in 1940. 2580 boulevard Pie-IX is assessed at $1,129,300, 42% more than 2302-2306 boulevard Pie-IX ($796,800). Each has 2 building permits on record. Neither is in a flood zone.
| 2302-2306 boulevard Pie-IX | 2580 boulevard Pie-IX | |
|---|---|---|
| Type | 3 dwellings | 3 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1940 | 1930 |
| Assessed (roll) | $796,800 | $1,129,300 |
| Since the previous roll | +3 % | +3 % |
| Welcome tax on that value | ≈ $11,285 | ≈ $18,058 |
| Lot | 295 m² | 238 m² |
| Floor area | 230 m² | 338 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | Yes |
| In a flood zone | No | No |
| Building permits on record | 2 · Nov 2012 | 2 · Sep 2019 |
| Findings | 1 Serious 1 Check 5 Note | 1 Check 5 Note |
| Nearest metro | Pie-IX, 490 m | Pie-IX, 190 m |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2302-2306 boulevard Pie-IX Full report: 2580 boulevard Pie-IX