2250 boulevard Pie-IX vs 2308-2312 boulevard Pie-IX
Data as of November 1, 2026 · updated every week
2308-2312 boulevard Pie-IX is the older building (1940); 2250 boulevard Pie-IX was built in 1944. 2250 boulevard Pie-IX is assessed at $1,295,700, 57% more than 2308-2312 boulevard Pie-IX ($827,800). 2250 boulevard Pie-IX has 0 building permits on record, 2308-2312 boulevard Pie-IX has 3. Neither is in a flood zone.
| 2250 boulevard Pie-IX | 2308-2312 boulevard Pie-IX | |
|---|---|---|
| Type | 7 dwellings | 3 dwellings |
| City and borough | Montréal · Mercier-Hochelaga-Maisonneuve | Montréal · Mercier-Hochelaga-Maisonneuve |
| Built | 1944 | 1940 |
| Assessed (roll) | $1,295,700 | $827,800 |
| Since the previous roll | +4 % | +3 % |
| Welcome tax on that value | ≈ $22,218 | ≈ $11,905 |
| Lot | 433 m² | 294 m² |
| Floor area | 391 m² | 230 m² |
| Notice of deterioration | No | No |
| City’s right of first refusal | No | No |
| Heritage | No | No |
| In a flood zone | No | No |
| Building permits on record | 0 | 3 · Jul 2020 |
| Findings | 4 Note | 1 Check 4 Note |
| Nearest metro | Pie-IX, 580 m | Pie-IX, 480 m |
The full report for each address explains every finding and shows the full permit and value history.
Full report: 2250 boulevard Pie-IX Full report: 2308-2312 boulevard Pie-IX